West Dimond Boulevard – Phase I Design Phase (65%)

Thank you for attending the Open House on September 10, 2014

Thank you for joining us at the Public Open House to review the design plans for West Dimond Boulevard and to talk with the project team one-on-one.

West Dimond Boulevard Upgrade – Phase I (Westpark Drive to Sand Lake Road) is currently in the Design Phase (65% design completion). Design documents have recenlty been released for public and agency review and are available below.

The Plan Set is a large file and is separated into 2 files for ease of downloading and viewing:

W DIMOND 65 Percent Complete Plans_Part1

W DIMOND 65 Percent Complete Plans_Part2

65% Plans in Sections

1 – W DIMOND 65 Percent Plans – General Info

2 – W DIMOND 65 Percent – Plans – Right of Way

3 – W DIMOND 65 Percent – Plans – Demolition

4 – W DIMOND 65 Percent – Plans – Typical Sections

5 – W DIMOND 65 Percent – Plans – Plan and Profile

6 – W DIMOND 65 Percent – Plans – Grading

7 – W DIMOND 65 Percent – Plans – Details

8 – W DIMOND 65 Percent – Plans – Illumination

9 – W DIMOND 65 Percent – Plans – Signing and Striping

10 – W DIMOND 65 Percent – Plans – Landscaping