West Dimond Blvd Upgrade – Phase I Plans are at 95%

The West Dimond Blvd. Upgrade Phase I: Westpark Drive to Sand Lake Road is at 95% Design.  The plan documents are available below for public and agency review.  If you would like more information or have questions about the 95% Design plans, please contact a member of the project team.

95% Design Plans

1. 95% Design – Index, Key, Legend

2. 95% Design – Survey and Right-Of-Way

3. 95% Design – Demolition

4. 95% Design – Typical Section, Plan and Profile, Drainage

5. 95% Design – Grading, Driveways, and Details

6. 95% Design – Lighting, Signing and Striping

7. 95% Design – Landscape, Water and Sewer